top of page
0.png
1.png
4.png
3.png

Bosch Rexroth 

 

Client: Bosch Rexroth Corporation

​​

Originally founded as Basic Structural Steel Fabricators, Bosch Rexroth Corporation evolved into a major hydraulics supplier through its alliance with G.L. Rexroth GmbH of Germany.
George Robb Architect was engaged for multiple phases of expansion, beginning with a second‑floor office addition in 1994 and an enlarged assembly shop with new loading dock in 1996. Following a 1998 site acquisition, a master plan delivered a 40,000 ft² manufacturing facility with specialized process areas and a four‑storey, 27,000 ft² staff building housing offices, meeting rooms, cafeteria, and support facilities. The former shop was repurposed for service and warehousing, while Phase II introduced a new public entrance and executive offices.
Completed in just twenty‑five months, the project unified the campus with an elevated walkway connecting old and new facilities.

bottom of page